Phase I

Description

Phase 1 extends from the Foothills grade separation to the US 95 interchange south of the existing US 93/US 95 interchange for a project length of approximately 2.75 miles. A visual simulation of the Railroad Pass interchange is shown below, depicting what it might look like when complete. Click on the image below for larger view.

This visual simulation shows what the Railroad Pass interchange might look like.

Development of Phase 1 is broken into 4 packages:

Package 1: Right of Way setting for US 93/US 95 Freeway Improvements.

Package 2: Construct the frontage road and utility relocations.
Click on the map below for larger view.

Conduct the construction of the Frontage Road and relocate utilities.

Package 3: Construct realigned US 93/ US 95 mainline to the intersection with the frontage road and the new interchange at Railroad Pass.
Click on the map below for larger view.

Construction of the realigned I-515 to the Railroad Pass Interchange.

Package 4: Complete the US 93/US 95 Interchange at Railroad Pass, and construct the new US 95 connection, bypassing the existing US 93/US 95 interchange.
Click on the map below for larger view.

Complete the I-515 construction and landscape.

Project Status