Boulder
City / US 93 Corridor Study |
|
COVER |
|
|
|
Abstract |
|
|
|
ES |
|
ES-1 |
|
1 |
|
1-1 |
|
1.1 |
Proposed Action |
1-1 |
|
1.2 |
Purpose of the Project |
1-2 |
|
1.3 |
Need for the Project |
1-2 |
|
1.4 |
Previous Studies Conducted |
1-19 |
|
2. |
|
2-1 |
|
2.1 |
Introduction |
2-1 |
|
2.2 |
Project Description |
2-2 |
|
2.3 |
Project History |
2-2 |
|
2.4 |
Alternatives Identification, Screening, and Evaluation |
2-12 |
|
2.5 |
Alternatives Studied in Detail |
2-28 |
|
2.6 |
Determination of the Preferred Alternative |
2-36 |
|
2.7 |
Changes Since Publication of the DEIS |
2-40 |
|
3. |
|
3-1 |
|
3.1 |
Introduction |
3-1 |
|
3.2 |
Air Quality |
3-2 |
|
3.3 |
Noise |
3-6 |
|
3.4 |
Biology/Threatened Species |
3-14 |
|
3.5 |
Water Quality |
3-28 |
|
3.6 |
Wetlands/Waters of the U.S. |
3-37 |
|
3.7 |
Floodplains |
3-49 |
|
3.8 |
Cultural Resources |
3-59 |
|
3.9 |
Land Use |
3-87 |
|
3.10 |
Visual Impacts |
3-97 |
|
3.11 |
Economic Impacts |
3-127 |
|
3.12 |
Social Impacts |
3-131 |
|
3.13 |
Environmental Justice |
3-142 |
|
3.14 |
Bicycles/Pedestrians |
3-149 |
|
3.15 |
Hazardous Waste |
3-158 |
|
3.16 |
Energy Use |
3-173 |
|
4. |
|
4-1 |
|
4.1 |
Introduction |
4-1 |
|
4.2 |
Air Quality |
4-1 |
|
4.3 |
Noise |
4-6 |
|
4.4 |
Biology/Threatened Species |
4-18 |
|
4.5 |
Water Resources |
4-29 |
|
4.6 |
Wetlands/Waters of the U.S. |
4-38 |
|
4.7 |
Floodplains |
4-55 |
|
4.8 |
Cultural Resources |
4-60 |
|
4.9 |
Land Use |
4-66 |
|
4.10 |
Visual Impacts |
4-75 |
|
4.11 |
Economic Impacts |
4-99 |
|
4.12 |
Social Impacts |
4-110 |
|
4.13 |
Environmental Justice |
4-115 |
|
4.14 |
Bicycles/Pedestrians |
4-119 |
|
4.15 |
Hazardous Waste |
4-129 |
|
4.16 |
Energy Use |
4-138 |
|
4.17 |
Construction Impacts |
4-141 |
|
5. |
5-1 |
|
|
5.1 |
Unavoidable Adverse Impacts |
5-1 |
|
5.2 |
Local Short-Term Uses Versus Long-Term Productivity |
5-4 |
|
5.3 |
Irreversible and Irretrievable Commitment of Resources |
5-5 |
|
6. |
|
6-1 |
|
6.1 |
Introduction |
6-1 |
|
6.2 |
Cumulative Impacts Analysis |
6-1 |
|
6.3 |
Methods Used for Identifying Other Past, Present, and Reasonably Foreseeable Actions/Projects |
6-3 |
|
6.4 |
Past, Present, and Reasonably Foreseeable Actions/Projects and Respective Environmental Impacts |
6-3 |
|
6.5 |
Cumulative Environmental Impacts |
6-23 |
|
6.6 |
Mitigation Measures for Cumulative Impacts |
6-33 |
|
7. |
|
7-1 |
|
7.1 |
Purpose of Section 4(f) Evaluation |
7-1 |
|
7.2 |
Proposed Project |
7-2 |
|
7.3 |
Purpose and Need |
7-5 |
|
7.4 |
Project Alternatives Considered |
7-5 |
|
7.5 |
Description of Section 4(f) Properties |
7-7 |
|
7.6 |
Avoidance Alternatives |
7-19 |
|
7.7 |
Alternatives and Measures to Minimize Harm |
7-20 |
|
7.8 |
Coordination |
7-23 |
|
7.9 |
Determination |
7-24 |
|
8. |
8-1 |
|
|
8.1 |
Public and Agency Scoping |
8-1 |
|
8.2 |
Consultations Since Release of the DEIS |
8-6 |
|
9. |
9-1 |
|
|
10. |
|
10-1 |
|
11. |
|
11-1 |
|
Index |
|
Index-1 |
|
|
|
|
|
Appendixes |
||
|
A |
|
|
|
B |
|
|
|
C |
|
|
D
|
|
|
E
|
|
|
|
|
8-1 |
|
2-1 |
|
2-1-1 |
|
2-1.1 |
Introduction |
2-1-1 |
|
2-1.2 |
Notice of Availability in Federal Register |
2-1-1 |
|
2-1.3 |
Distribution of DEIS |
2-1-1 |
|
2-1.4 |
Website |
2-1-2 |
|
2-1.5 |
Public Hearing |
2-1-2 |
|
2-1.6 |
Comments on the DEIS |
2-1-5 |
|
2-1.7 |
Responses to Comments |
2-1-16 |
|
Appendixes |
||
|
A |
||
|
B |
||
|
C |
||
D
|
|
|
E
|
||
F
|
|
|
G
|
|
|